EIA report of Shandong Jinchen's 20,000 t per year allulose project publicised 07-07-2022

Summary: The EIA report of Shandong Jinchen's 20,000 t/a psicose project was publicised for public participation.

The environmental impact assessment (EIA) report of Shandong Jinchen Biotechnology Co., Ltd. (Shandong Jinchen) was publicised on 7 June for public participation.

 

Project Overview:

  • Construction nature: New construction
  • Location: Tianqiao District, Jinan City, Shandong Province
  • Site area & floor area: 13,767m2 & 21,340m2 (This project will be carried out the rented factories. No new factory buildings will be built and no additional land will be used.)
  • Total investment: USD30.01 million (RMB200 million), of which USD750,176 (RMB5 million) for environmental protection purposes
  • Construction content: To build a production workshop, boiler rooms, sewage stations, laboratories, offices, etc. and purchase seed fermenters, fermenters, centrifugal machines, dryers and other equipment
  • Production capacity: The construction of this project will be divided into two phases. Upon completion, the whole factory will be able to produce 20,000 t/a psicose & byproduct—2,420t/a F42 HFCS (high fructose corn syrup)
  • Phase I: 3,000 t/a psicose & byproduct—363 t/a F42 HFCS
  • Phase II: 17,000 t/a psicose & byproduct—2,057 t/a F42 HFCS
  • Production process:
  • Convert the glucose into fructose with the purchased isomerase—obtain purified fructose solution after filtration, centrifugation, desalinisation and other processes—convert the fructose into psicose with the bio enzyme that is cultivated with special strain—obtain the high-purity crystalline psicose and liquid psicose after centrifugation, filtration, desalinisation, separation, concentration, crystallisation, drying and other processes
  • Besides, mix the glucose and fructose that have not been fully converted to produce the byproduct F42 HFCS
  • Labour quota: 60 employees for Phase I & 300 employees for Phase II
  • Working system: Three eight-hour shifts (24-hour workday)
  • Progress:
  • Phase I: It is estimated that the construction of Phase I will last for 5 months and it will be put into production in Jan. 2023
  • Phase II: It is expected that Phase II will enter the production stage in June 2025
  •  

    Established in Oct. 2021 with a registered capital of USD2.14 million (RMB14.29 million), Shandong Jinchen focuses on R&D and the industrialisation of rare sugar. With the bioengineered strain developed by the research team from the State Key Laboratory of Microbial Technology of Shandong University, the company prepares high-purity psicose products by carrying out the biotransformation of raw materials and catalytic transformation of enzyme preparation.

Source:CCM


More information can be found at CCM Sweeteners China Monthly Report.


About CCM:

CCM is the leading market intelligence provider for China’s agriculture, chemicals, food & feed and life science markets. Founded
in 2001, CCM offers a range of content solutions, from price and trade analysis to industry newsletters and customized market research reports. CCM is a brand of Kcomber Inc.
 
For more information about CCM, please visit www.cnchemicals.com or get in touch with us directly by emailing econtact@cnchemicals.com or calling +86-20-37616606.



Subscribe to our Newsletter



Next Press